- Aspect ratio
- The width of a screen divided by its height, such as 16:9. Content must be made to the wall’s ratio or it is stretched or letterboxed.
- Box truss
- Square aluminium truss with four main chords, such as F34. Used for ground support, frames and flown grids.
- Brightness (nits)
- How much light an LED wall emits. Indoor events need far less than outdoor; too bright looks harsh on camera.
- Build-up
- The period before an exhibition opens when stands and technical are installed. Fixed by the organiser.
- Chain hoist
- A motor that lifts truss to its trim height. Rated by load, such as one tonne.
- Circular truss
- Truss made in curved sections to form rings and circles, often for headers over a stand.
- Comms
- Talkback between the show crew, stage manager and operators.
- Connected load
- The total electrical power the kit draws. Calculated on the drawing so the venue can supply the right board.
- Content resolution
- The exact pixel width and height an LED wall displays. Content made to this size shows without scaling.
- Coverage
- The area a loudspeaker system reaches evenly. Planned on the drawing so every seat hears clearly.
- Dante
- A network protocol that carries audio between consoles, stage boxes and amplifiers over standard cables.
- De-rig
- Taking the technical down and out of the venue after the show.
- Distribution board
- The unit that takes the venue’s supply and splits it into protected circuits for the kit — 16, 32, 63 or 125 A.
- Dry hire
- Renting equipment without design, crew or operation. Not what we do.
- Elevation
- A drawing looking at the rig or stage from the front or side, with heights.
- F34
- A common box-truss size with roughly 290 mm sides. F34P is the version with plates for joining.
- Flown rig
- Truss and kit hung from the venue roof on hoists, rather than standing on the floor.
- Frequency coordination
- Planning radio microphone channels so they do not interfere with each other or with other users.
- Ground support
- A truss structure that stands on the floor and carries the rig where the roof cannot.
- Isometric
- A 3D drawing view showing the rig from above at an angle, so heights and layout read at once.
- LED floor
- LED panels built to be walked on, used for entrances, stages and features.
- Lighting plan
- The drawing showing every fixture, its position and what it lights.
- Load calculation
- The sum of everything hanging on each rigging point — truss, LED, lighting and cable.
- Load-in
- Bringing the technical into the venue and building it.
- Method statement
- The written sequence of how the work will be done safely, issued before anything is rigged.
- Moiré
- A wavy pattern that appears when a camera films an LED wall. A finer pixel pitch reduces it.
- Moving head
- A light that pans, tilts and changes colour and beam under control from the desk.
- Pixel map
- The drawing of an LED wall’s panel grid and pixel dimensions, sent to the content team.
- Pixel pitch
- The distance between pixel centres on an LED wall, in millimetres — P1.9, P2.6. Smaller means sharper up close.
- Point load
- The weight on a single rigging point.
- Processing
- The hardware that takes a video signal and maps it onto the LED panels, such as Novastar.
- Rigging plot
- The drawing of every truss, hoist and point load. The venue approves it before anything is hung.
- Risk assessment
- The written review of what could go wrong and how it is controlled.
- Run of show
- The minute-by-minute running order the technical is cued against.
- Show control
- The desk and system that triggers video, lighting and audio cues together.
- Socapex
- A multi-circuit cable and connector that carries six power circuits to lighting in one run.
- Stage deck
- A modular platform that builds a stage to the height and size on the drawing.
- Static wash
- A fixed light that floods an area with even colour.
- Switching
- Changing between video sources — presentations, cameras, playback — such as with PixelHue.
- Three-phase
- A power supply with three live conductors, used for larger loads. Event boards are usually three-phase.
- Trim height
- The height a flown truss is set to.
- Uplighting
- Lights at floor level washing walls or columns with colour.
- Vectorworks
- The CAD software we draw every project in.
- Walk-up
- The music or sound played as a presenter or award winner walks to the stage.