On site now · Live

Home · Services · Trussing

Truss and rigging, calculated per point.

Rigging is the part of this trade that goes wrong badly. Every load is calculated and drawn per point, and the rigging plot is ready for the venue’s approval or the organiser’s submission.

What we supply

Trussing: the kit and the people who run it.

Ground support, goal posts, totems, circular trusses and flown grids on one-tonne hoists. Every load is calculated and drawn per point before it is rigged.

  • Box truss — Global Truss F34P.
  • Ground support — Goal posts, totems and ground-supported grids where the roof cannot take the load.
  • Circles and rings — Circular trusses for headers, rings and feature rigs.
  • Flown rigs — Grids on one-tonne motor hoists, with loads drawn per point.
  • Paperwork — Rigging plot, load calculation, method statement and risk assessment.
How it is delivered

Drawn, prepped, built and run.

01

Calculated

The HELM rig load was 1,942 kg — calculated and drawn before it was hung.

02

Approved

Plot issued at least 3 working days before load-in.

03

Rigged safely

Crew trained for working at height and rigging, with the right PPE.

Questions

Will you prepare the rigging plot for the venue?

Yes. Every project gets a rigging plot and load calculation, issued at least 3 working days before load-in, ready for the venue or the organiser.

Can you hang from the hall roof?

Where the venue allows it, yes — flown rigs on one-tonne hoists, with loads drawn per point. Where it does not, we design ground support instead.

Questions

Asked before the quote.

All questions
Contact

Send us your next brief.

Send us your brief WhatsApp usProposal back within 24 hours of complete event details.
WhatsApp us