Home · Work
The projects, and the kit that went in.
Every figure is taken from the order record for that project — what was drawn, loaded and run. Nothing is a brochure number.

Department of Energy at ADIPEC
Three LED walls: a 4.5 m vertical wall, a curved 5.5 m corner header and an MOU screen
Read the project
PME Energy at ADIPEC
A 7.5 m curved LED header and three LED rings round the logo, on 50 m of truss
Read the project
Weatherford at ADIPEC
Three LED walls, including a 4.5 m fascia on the upper corner and a fine-pitch P1.9 presentation wall
Read the project
Koch at ADIPEC
A 15 m hanging LED band and a 4.5 m world-map LED wall
Read the project
Morocco Pavilion
A 20.5 m ring screen and nine LED surfaces in one stand
Read the project
Etihad Rail Annual Awards
A curved P1.9 wall on 12 one-tonne hoists
Read the project
HELM
Four LED walls, four pillars, one stand
Read the project
EDB Connect
An 8 × 4 m main wall for Emirates Development Bank
Read the project
Ru’Ya Careers 2026
Eight stands in one hall, same days
Read the project
Nomura client evening
A 12 × 5.5 m goal post truss and 72 uplighters
Read the project
Baby Expo 2026
Three stages running at once
Read the project
Ministry of Education
A live press conference to the national press
Read the project
Stc at Expand North Star
Five LED walls, three days to build
Read the project
Help AG at GISEC
A 4 × 5.5 m P1.9 wall and 18 displays
Read the project
ATRC at ISNR
Truss and moving-head rig. The write-up, kit list and figures are being prepared from the order record.

First Abu Dhabi Bank at AI Everything
Ring header and LED. The write-up, kit list and figures are being prepared from the order record.

Kerzner at ATM
LED towers and stand video. The write-up, kit list and figures are being prepared from the order record.

HSBC Blue Note
Stage, PA and lighting. The write-up, kit list and figures are being prepared from the order record.