
What the room needs from us.
The submission
Rigging plot ready for the organiser’s deadline.
Fit to the stand
LED and truss drawn to your stand drawings.
The build-up window
Crew sized to the window; the schedule holds.
Your build stays yours
We never touch the fabrication.
What we bring to exhibition stands.
Video
Unilumin LED walls at P1.9 and P2.6, displays and touchscreens, playback, switching and show control.
VideoTrussing
Global Truss F34P ground support and flown rigs on one-tonne hoists, loads drawn per point.
TrussingLighting
CLF moving and static fixtures, design, programming and operation.
LightingPower
Certified distribution from the venue’s supply point — 16, 32 and 63 A, with 125 A.
PowerExhibition stands, delivered.
What you can hold us to.
Proposal
Back within 24 hours of complete event details — date, venue, timings and scope.
Site visit
Within 48 hours of a request, at any venue we work in.
Drawings
Rigging plot, lighting plan and 3D render at least 3 working days before load-in.
Number
The quoted number is the invoiced number. A change is quoted and agreed in writing first.
Leads
The same three people on every project, first call to de-rig. No account manager between.
Shortcuts
A method statement and risk assessment before anything is rigged.









