
Power: the kit and the people who run it.
Certified distribution boards for 16, 32, 63 and 125 A supply, power cable and Socapex runs, and cable ramps. The venue or client provides the incoming supply; we supply and install the distribution from there.
- Distribution boards — Certified boards for 16, 32, 63 and 125 A supply.
- Cable — Power cable and Socapex runs, labelled end to end.
- Protection — Cable ramps and covers across walkways.
- The figure — The connected load, stated per project for your records.
Drawn, prepped, built and run.
Calculated
Load worked out on the drawing before anything is plugged in.
Tested
Distribution labelled and tested before show power.
Clear scope
Mains and MEP work stay with the venue. We say so at quote stage.
Power on recent projects.
Questions
Do you supply generators?
No. The venue or client provides the incoming supply; we supply and install the distribution from that point.
Can you give us a power figure for the organiser?
Yes. The connected load is calculated on the drawing and stated for every project.
Six disciplines, one drawing.
Video
Unilumin LED walls at P1.9 and P2.6, displays and touchscreens, playback, switching and show control.
VideoLighting
CLF moving and static fixtures, design, programming and operation.
LightingAudio
L-Acoustics PA, Yamaha digital consoles, Shure radio microphones and comms.
AudioTrussing
Global Truss F34P ground support and flown rigs on one-tonne hoists, loads drawn per point.
Trussing


