On site now · Live

Home · Company · How we work

From plan to load-out.

You brief it once. We draw it, build it, run it and strike it.

The method

Six steps, the same on every project.

01

Brief

We read the requirement and specify the system that answers it — before a price exists.

02

Drawing

Rigging plot, lighting plan, LED layout and 3D render. You approve the room on screen.

03

Prep

Every case checked and labelled against the plot. Redundancy specified, not guessed.

04

Load-in

A crew sized to the project, led on site. The schedule holds.

05

Show

Operated by the people who built it.

06

Load-out

A clean de-rig, and the connected load reported for your records.

What arrives before the truck

Every project is approved on screen before anything is built.

A rigging plot, a lighting plan, an LED pixel map and a 3D render of your room — drawn in Vectorworks by the people who will build it.

The Nomura ballroom drawn in 3DThe Nomura ballroom as builtDrawnBuilt
HELM · Rig load · 1,942 kg, calculated
HELMRig load · 1,942 kg, calculated
Koch at ADIPEC · Hanging LED screens · elevations
Koch at ADIPECHanging LED screens · elevations
ATRC at ISNR · Rig in isometric
ATRC at ISNRRig in isometric
The drawing room
The kit we own

Our kit, in our warehouse. Ready before you ask.

We own our core inventory, keep it in our own warehouse, and track every case in Current RMS.

The Pixonic warehouse
LED
Unilumin, P1.9 and P2.6 — flexible, straight and corner
Truss
Global Truss F34P · one-tonne motor hoists
Lighting
CLF Poseidon and CLF Ares · LED floods
Audio
L-Acoustics Syva, X12 and X8 · Yamaha QL1 · Shure radio microphones
Power
Certified distribution boards for 16, 32, 63 and 125 A supply · power cable · Socapex
Screens
LED display screens and touchscreens, all sizes
Tracking
Every case tracked in Current RMS, from prep to show run
Working with us

What you can hold us to.

24 h

Proposal

Back within 24 hours of complete event details — date, venue, timings and scope.

48 h

Site visit

Within 48 hours of a request, at any venue we work in.

3 days

Drawings

Rigging plot, lighting plan and 3D render at least 3 working days before load-in.

One

Number

The quoted number is the invoiced number. A change is quoted and agreed in writing first.

Three

Leads

The same three people on every project, first call to de-rig. No account manager between.

Zero

Shortcuts

A method statement and risk assessment before anything is rigged.

Responsibility

Every cable accounted for. Every spare planned.

Your client will ask about sustainability before they ask us. Reusing truss, LED and transport is the rental model, not an achievement. What is ours is the judgement behind it: spares specified on the plot, the connected load stated as a power figure for your client, and everything moved in one run.

No measured carbon figure yet — we are recording the inputs for one, project by project.

Ready for your procurement

✓

Public liability and workmen’s compensation insurance

✓

Method statement and risk assessment on every project

✓

Crew trained for working at height and rigging

✓

Trade licence 1478824 · VAT registered

✓

Equipment list, sample drawings and references

✓

The full prequalification pack on request

Contact

Send us your next brief.

Send us your brief WhatsApp usProposal back within 24 hours of complete event details.
WhatsApp us