Selected work · 07
HELM at the Abu Dhabi Future Health Summit
A front wall that carries the brand, two tall screens framed in the set, a fourth beside the welcome desk and four LED pillars — each drawn, rigged and mapped before it was built.
For the Abu Dhabi Department of Economic Development · ADNEC Abu Dhabi · October 2026
387LED panels
4big LED walls
4LED pillars





- Video
- 387 Unilumin panels: four big LED walls and four LED pillars · Novastar 4K Prime Pro
- Lighting
- 16 CLF Yara and 20 LED floods on 96 m of F34P · 1,942 kg rig load, drawn
- Audio
- Shure radio microphones, mixer and speakers
- Power
- 63 A and 32 A three-phase
Taken from the order record for this project. The kit we own →
387LED panels
4big LED walls
4LED pillars





Contact