
Home · Who we work for · Exhibition stand builders
The technical fit-out of the stand, on the hall’s clock.
Truss, LED and power that arrive on time and fit the stand. The rigging plot is ready for the organiser’s submission, and we never touch your build.
And what we do about it.
The build-up window
Crew sized to the window; LED, truss and power sequenced with your build.
Kit that does not fit the stand
LED and truss drawn to your stand drawings before anything is cut.
A late rigging submission
Rigging plot ready for the organiser’s deadline.
- Depth in the halls — Dubai World Trade Centre, ADNEC, Dubai Exhibition Centre and Expo Centre Sharjah, season after season.
- Every case prepped and labelled against the plot, so the aisle stays clear.
- We never touch the fabrication — your build stays yours.
- One crew, one handover.
Projects like yours.
What you can hold us to.
Proposal
Back within 24 hours of complete event details — date, venue, timings and scope.
Site visit
Within 48 hours of a request, at any venue we work in.
Drawings
Rigging plot, lighting plan and 3D render at least 3 working days before load-in.
Number
The quoted number is the invoiced number. A change is quoted and agreed in writing first.
Leads
The same three people on every project, first call to de-rig. No account manager between.
Shortcuts
A method statement and risk assessment before anything is rigged.
Questions
Can you build the stand or the set as well?
No. Six disciplines — video, lighting, audio, trussing, power and staging — and fabrication is not one of them. We work alongside your fabricator and hand over the technical on the hall’s clock.
Can you cope in peak season — GITEX week?
The crew is sized to the project from a regular pool of 25+. If we cannot do a project properly, we say so at quote stage. We turn work down rather than stretch.
What do you need to send a proposal within 24 hours?
The event date and timings including build and de-rig, the venue and room or hall, the scope — video, lighting, audio, truss, power, staging — and any drawings or renders of the stand or set. With those details, the proposal is back within 24 hours.


