In the exhibition halls the clock belongs to the organiser. The build-up window is fixed, the hall opens on time, and every hour the technical takes is an hour the stand builder does not have.
Submit early
Organisers ask for the rigging plot weeks before build-up. We draw it from your stand drawings, so the submission goes in with your stand plans rather than after them.
Prep in the warehouse, not in the aisle
Every case is checked and labelled against the plot before it leaves. LED arrives in the order it is built, truss arrives pre-planned, and power is labelled board by board.
Sequence with the build
Flown truss and headers go up before the stand closes in; LED is built when the openings are ready; power lands where the stand needs it. We agree the sequence with your site manager before day one.
Your build stays yours
We never touch the fabrication. We work alongside your team and hand over the technical on the hall’s clock — season after season, at Dubai World Trade Centre, ADNEC, Dubai Exhibition Centre and Expo Centre Sharjah.