Every project we deliver is drawn before it is built. The rigging plot is the drawing the venue cares about most, because it says what will hang from their roof, where, and how much it weighs.
What the plot shows
- Every truss position, with heights and trims.
- Every hoist or ground-support point, numbered.
- The load on each point — truss, LED, lighting and cable — and the total.
- Fixture and screen positions, so the lighting plan and the LED layout sit on the same drawing.
Who asks for it
Hotel ballrooms and theatres ask for it before they confirm the rig. In the exhibition halls, the organiser asks for it as part of the stand submission, often weeks before the build-up. A stand builder who cannot submit a plot on time does not get to hang anything.
Calculated, not estimated
On HELM at ADNEC the rig load came to 1,942 kg. It was calculated point by point and drawn before a single truss left the warehouse. That figure is what lets a venue engineer say yes.
What travels with it
A method statement and risk assessment are issued before anything is rigged, and the crew who rig it are trained for working at height. The plot, the lighting plan and the 3D render reach you at least 3 working days before load-in — so the event is approved on screen before anything is built.